TEEX
  
  Español  |   Register  |   Course Catalog  |   Course Calendar  |   Online Courses  |   DHS-FEMA Courses  |   Veterans Benefits  |   Contact Us        
submenu arrow Press Release Archives

TEEX breaks ground on new operations complex at Brayton Fire Training Field


Date: January 4, 2006  

(L-R) Breaking ground were TEEX Director Robert L. Smith; Dr. G. Kemble Bennett, Vice Chancellor and Dean of Engineering for The Texas A&M University System; Chief Henry D. Smith; and Les Bunte, Division Director of TEEX's Emergency Services Training Institute.
COLLEGE STATION – The Texas Engineering Extension Service (TEEX) will break ground on a two-story operations complex at the Brayton Fire Training Field named in honor of longtime Fire Chief Henry D. Smith on Friday, Jan. 6, at 10 a.m.

The Henry D. Smith Operations Complex will include a welcome center, communications center/scenario observation area, three large classrooms and an assembly hall. The 14,000-square-foot building represents the first major construction project at the Brayton Fire Training Field since the September 2000 completion of TEEX’s Emergency Operations Center, which is located adjacent to Disaster CityTM.

Smith, of Bryan, led TEEX’s former Fire Protection Training Division from 1957 to 1986 and is credited for expanding the agency’s reputation internationally. Smith’s involvement with the fire service in Mexico and his commitment to addressing issues shared by firefighters on both sides of the border led to the creation of TEEX’s training programs for Spanish-speaking firefighters in 1966. Fire field entrance

Additionally, the Brayton Fire Training Field doubled in size to 120 acres under Smith’s leadership, leading to new training programs for industrial fire brigades, liquefied natural gas, hazardous materials and building code inspectors.

The Smith Operations Complex will be located at the Gate C entrance of the Brayton Fire Training Field and is expected to be completed in Spring 2007. Joining Smith in the groundbreaking festivities will be Dr. G. Kemble Bennett, Vice Chancellor and Dean of Engineering for The Texas A&M University System; TEEX Director Robert L. Smith; and Chief Les Bunte, Division Director of TEEX’s Emergency Services Training Institute.

The future facility is part of a $23 million infrastructure upgrade initiative at the Brayton Fire Training Field. Other projects in development include an enhanced chemical complex training prop, a two-story structural burn building and a state-of-the-art water/wastewater treatment system.

Smith Building

Each year, TEEX trains more than 45,000 firefighters and emergency responders from all 50 states and 45 countries at the Brayton Fire Training Field. The site is recognized as the largest live-fueled firefighter training facility in the world, with 132 training stations and 22 fueled live-fire props.

TEEX has conducted fire and rescue training at the Brayton Fire Training Field’s present location off Nuclear Science Road since 1960. Firefighter training in College Station began in 1929 when the State Firemen’s and Fire Marshals’ Association selected Texas A&M as the site for a permanent firefighter training program.

A member of the A&M System, TEEX offers hands-on, customized training, exercises, technical assistance and technology transfer services impacting Texas and beyond. TEEX programs include fire, homeland security, law enforcement, public works, safety and health, search and rescue and technology transfer.


Contact Us · Site Map · Policies · Subscribe

© Texas A&M Engineering Extension Service - A member of The Texas A&M University System

Texas.gov · Statewide Search · Texas Homeland Security · Open Records · Risk, Fraud & Misconduct Hotline · Compact with Texans · State of Texas Fraud Hotline  4.2012.0401